PART-A
- A _______________ is a set of interacting
elements interacting with each other to achieve a predetermined objectives
(A) Component (B)
System (C)
A & B (D)
None
- Subsystem facilitates
(A) Analysis (B)
Communication
(C) A & B (D)
None
- _______________ which produced by transformation
process.
(A) Input (B)
Processing
(C) Output (D)
None
- Flow from inside the limitation to outside are
called
(A) Input (B)
Output
(C) A & B (D)
None
- ________________ system is one which is self
contained :-
(A) Open (B)
Close (C)
Deterministic (D)
Probabilistic
- _______________ system can adopt to changing
internal and environment conditions
(A) Open (B)
Close (C)
Deterministic (D)
Probabilistic
- ______________ system implies that the
interaction between various subsystem is know with certainty
(A) Open (B)
Close (C)
Deterministic (D)
Probabilistic
- A sub – system receives more than one input from
other sub – systems in
(A) Serial order (B)
Matrix order
(C) A & B (D)
None
- Traditional methods operate on the data model
which has a
(A) Structure (B)
Definition (C)
Application (D) All
- ___________ testing is carried out to confirm
data transaction and output’s
(A) Validity (B)
Accuracy (C)
A & B (D)
None
- _______________ is a kind of midwife to all
computer applications
(A) System requirement (B)
System analysis
(C) System design (D)
None
- The activities ,system analysis and system design
are carried out by :-
(A) System programmer (B)
System analyst
(C) System designer (D)
None
- DP system
(A) The computer system
(B) A system of interrelated programs
(C)
One that consist of hardware, software, people and procedure
(D) None
- ________________ which would define the scope and
the coverage of the system
(A) System objective (B)
System boundaries
(C) System importance (D)
None
- Return on the investment is not attractive then,
the management may __________ the project.
(A) Continue (B)
Drop (C)
Stop for some time (D) None
- ________________ refer to the collection of
information pertinent to systems project
(A) Problem definition (B)
Area selection
(C) Data gathering (D)
Creation of alternatives
- ________________ is description and flowchart of
system processing steps.
(A) General background (B)
Documents
(C) Procedures (D)
Organization chart
- Documentation can be
(A) For management (B)
For user
(C) For data processing department (D)
All
- _______________ phase culminates in a document
which is then approved or modified by user and DP management
(A) System analysis (B)
System design
(C) System implementation (D)
System maintenance
20. _____________ suggest improvements to design
or ways the system could operate more eloquently
(A) Documentation review (B)
Cost analysis
(C) Internal controls (D)
Recommendation
21. _______________ design includes understanding
of the flow of information, logical of processing and input
output relationship.
(A) Conceptual system (B)
Logical system
(C) Physical system (D)
None
- Physical system consist of
(A) Programs (B)
Data files
(C) Documentation (D)
All
- Feasibility analysis involve :-
(A) Economic (B)
Technical (C)
Behavioral (D) All
- ______________review decision making and
individual information needs at various levels
(A) Feasibility study (B)
System analysis
(C) Both A & B (D)
None
- A document which contains bonafide details of
each and every data item used in system is called
(A) Input definitions (B)
Output definitions
(C) Data dictionary (D)
None
- Support provided to development team include.
(A) Office space (B)
Relevant data
(C) Secretarial assistance (D) All
- EDP stands for
(A) Electrical data processing department (B)
Electronic data provider department
(C) Electronic data processing department (D) None
- Recruiting and training of system staff and reviews
their performance done by
(A) System analyst (B)
Child system analyst
(C) A & B (D)
None
- _______________ committee approves or disapproves
projects and set priorities
(A) Steering (B)
Information system (C)
User – group (D) None
- Project proposals submitted by the ______________
to project selection committee
(A) User (B)
Analysts (C)
A & B (D)
None
- Dictionary documentation can be considered as
(A) Local (B)
Fragmented (C)
A & B (D)
None
- JCL stands for
(A) Java compiler language (B) Job
control language
(C) Job communication language (D) None
- N – S charts are also called :-
(A) Flow chart (B)
Chapin charts
(C) Grid chart (D)
X – chart
- Consisting a list of all the conditions that are
to be taken account
(A) Condition stub (B)
Condition entries
(C) Action stub (D)
Action entries
- CASE stands for
(A) Company assisted software engineering (B) Computer
assisted software engineering
(C)
Cascade accounting software engineering (D)
None
- VTOC reads from ____________ and from ______________
(A) Top – to – down, left to right (B)
Left – to – right, top – to – down
(C) Both A & B (D)
None
- ________________ arrange the program modules in
order of priority
(A) VTOC (B)
IPO (C)
Both A & B (D) None
- Iteration structure called repetition in the
_____________ notation
(A) HIPO (B)
Warnier – ORR
(C) N – S charts (D)
None
- The functionally ______________ perform
documentation only
(A) Passive data dictionaries (B)
Active data dictionaries
(C) In – line data dictionaries (D) Both
- _______________ is related to one DBMS
(A) Integrated Dictionary (B)
Stand – alone dictionary
(C) A & B (D)
None
PART-B
- State true or false :-
(1) System is an important factor of management
information system
(2) Flow from the environment into the system are
called output
(A) TT (B)
TF (C)
FT (D)
FF
- State true or false :-
(1) A water fall model does not rise from higher level
to lower level
(2) Once the system implementation is complete the
system is tested at site
(A) TT (B)
TF (C)
FT (D)
FF
- State true or false :-
(1) The process of introducing new requirement (after
installation) without disturbing the time tested basic system is called
maintenance
(2) Operational information relates to the level of
decision making referred to as operational control.
(A) TT (B)
TF (C)
FT (D)
FF
- Searching the environment for conditions calling
or decisions in
(1) Intelligence (2)
Choice (3)
Design
(A) 1 (B)
2 (C)
1, 2 (D)
1, 3
- State true or false :-
The use of decision support system is to test the
(1) Decision alternatives (2) Sensitivity of the result
(A) TT (B)
TF (C)
FT (D)
FF
- State true or false :-
(1) DP system as apposed to a hardware or software
system
(2) Analysis of a system may involve upgrading the
system as whole
(A) TT (B)
TF (C)
FT (D)
FF
- State true or false :-
In problem definition
(1) Determine the objective of current system
(2) But does not prepare design specifications
(A) TT (B)
TF (C)
FT (D)
FF
- State true or false :-
(1) Tangible benefits are more difficult to estimate
(2) Intangible benefits are those that can be
accurately measured
(A) TT (B)
TF (C)
FT (D)
FF
- State true or false :-
(1) The result of formal evaluations are used in the
long range planning.
(2) Flow systems are perfectly designed and developed,
implementation does not include the correction of short coming.
(A) TT (B)
TF (C)
FT (D)
FF
- Install equipment consists of
(1) Site preparative (2)
Installation of data processing equipment
(3) Hardware and software check
(A) 1, 2 (B)
2, 3 (C)
1, 3 (D)
All
- State true or false :-
(1) The analyst may able to observe the intricacies of
the system
(2) The final output of system analysis phase is a
functional specifications report of the new system.
(A) TT (B)
TF (C)
FT (D)
FF
- State true or false :-
(1) Management services director has responsibilities
for all aspects of data processing operation research, organization and method
etc.
(2) Computer manager is responsible for the efficient
running of department and must be therefore to be good administrator.
(A) TT (B)
TF (C)
FT (D)
FF
- State true or false :-
(1) Steering committee is the method of reviewing and
selecting projects for development
(2) Senior executives are user manager of a
department.
(A) TT (B)
TF (C)
FT (D)
FF
- State true or false :-
(1) Security safeguarding sensitive and important data
in a form that is accessible only to unauthorized users
(2) Investigating of the existing system by means of
interviews questionnaires and observations is the responsibility of system
analyst.
(A) TT (B)
TF (C)
FT (D)
FF
- State true or false :-
System analyst begin as _____________ become
__________ then ________________.
(1) Senior system analyst (2) Chief system analyst
(3) Analyst
(A) 2, 3, 1 (B)
3, 2, 1 (C)
3, 1, 2 (D)
None
- IBM DB / DC data dictionary is
____________________ dictionary
(1) Stand – alone dictionary (2)
Integrated dictionary
(3) Passive data dictionary (4)
Active data dictionary
(A) 1, 2 (B)
2, 3 (C)
1, 4 (D)
1, 3
- _______________ these are tools used to convert specifications
into machine executable code.
(1) Front – end CASE tools (2)
Back – end CASE tools
(A) 1 only (B)
2 only (C)
1, 2 (D)
Whe
- State true or false :-
(1) DFD supply detailed descriptions of modules
(2) If in DFD parent data flow diagram shows three
input and two outputs then child diagram must have same.
(A) TT (B)
TF (C)
FT (D)
FF
- State true or false :-
(1) In DFD square box is the external source or
receiver of data
(2) In data dictionaries ‘+’ define AND
(A) TT (B)
TF (C)
FT (D)
FF
- ______________ which indicates the data store
(1) Open rectangle (2)
Two parallel lines
(3) Close rectangle (4)
Two perpendicular
(A) 1, 2 (B)
3, 4 (C)
1 (D)
2
PART-C
- Match the following -
(1)
|
System inquires
|
(A)
|
Formal reporting
|
(2)
|
Data analysis system
|
(B)
|
Procurement
|
(3)
|
Information analysis system
|
(C)
|
Job scheduling rules
|
(4)
|
Accounting system
|
(D)
|
Inventory analysis
|
(5)
|
Model based system
|
(E)
|
MRP systems
|
(a) 1 – A, 2 – B, 3 – C, 4 – D, 5 - E (b)
1 – B, 2 – D, 3 – E, 4 – A, 5 – C
(c) 1 – B, 2 – E, 3 – A, 4 – D, 5 – C (d) None
- State true or false :-
Unstructured
decisions
(1)Unique
in nature
(2)
Predefined procedures available to solve problems
(3)
Decisions can be delegated
(4)
Cost of taking such decision are quite high
(A)
TFTF (B)
FFFF (C)
TFFT (D)
FTTF
- State true or false :-
Characteristics of information
(1)
Accuracy (2) Form
information (3) Validity (4) Operationally
(A)
TTTF (B) TTFF (C) FTTF (D) FFFF
- Match the following -
(1)
|
Environmental information
|
(A)
|
Factors of production
|
(2)
|
Competitive information
|
(B)
|
Industry demand
|
(3)
|
Internal information
|
(C)
|
Sales forecast
|
(D)
|
The competitive data
|
||
(E)
|
Financial plan / budget
|
||
(G)
|
Economic trends
|
(A) 1 – ABC, 2 – DE, 3 – FG (B)
1 – ACF, 2 – BDE, 3 – G
(C) 1 – AEG, 2 – BD, 3 – CF (D) None
- Arrange the development steps in an order.
(1)
Implementation (2)
System design
(3)
Unit testing (4)
Maintenance
(5)
System development (6) integration of the modules
(7)
System testing (8)
requirement definition
(9)
Requirement analysis
(A)
1, 2, 3, 4, 5, 6, 7, 8, 9, (B)
8, 9, 2, 5, 6, 3, 7, 4, 1
(C)
9, 8, 2, 5, 3, 6, 7, 1, 4 (D)
9, 8, 2, 5, 3, 6, 7, 4, 1
- State true or false :-
Machine
operations should include:-
(1) System flow (2)
Detailed instruction for each step
(3) Processing schedules (4) Document receipt details
(A)
TTTT (B)
TTFF (C)
FFTT (D)
FFFF
- Match the following -
(1)
|
Technical
|
(A)
|
System packages
|
(2)
|
Operational
|
(B)
|
general regulatory
|
(3)
|
Economical
|
(C)
|
Benefits
|
(D)
|
Management system
|
||
(E)
|
Agencies
|
||
(F)
|
Models
|
(A)
1 – ABF, 2 – CD, 3 – F (B)
1 – ADF, 2 – BE, 3 – C
(C) 1 – AD, 2 – BE, 3 – CF (D) None
- State true or false :-
The
organization may get an opportunity due to :-
(1) A failure of an existing system
(2) The efficiency of existing system
(2) The efficiency of existing system
(3) A new product / plant / market
(4) Inefficiency of existing system
(A) TFTF (B)
TFTT (C)
FFTT (D)
TTTF
- Activities involved in system analysis are :-
(1)
Definition of overall system
(2)
Separation of the system into smaller and manageable parts.
(3)
Study of the organizational behavior.
(4)
Understanding the nature function and interrelationships
(A)
TTTT (B)
TTFT (C)
TFTT (D)
FFFF
- Match the following –
(1)
|
Capability
|
(A)
|
Enhanced communication
|
(2)
|
Control
|
(B)
|
Improved processing speed
|
(3)
|
Communication
|
(C)
|
Monitor cast
|
(4)
|
Cost
|
(D)
|
New product development
|
(5)
|
Competitiveness
|
(E)
|
Better security
|
(A)
1 – B, 2 – E, 3 – A, 4 – C, 5 – D (B)
1 – A, 2 – B, 3 – D, 4 – C, 5 – E
(C)
1 – E, 2 – D, 3 – C, 4 – B, 5 – A (D)
None
No comments: